CDCR Seeks Maintenance, Calibration and Repair Services for SCADA System at CA State Prison Solano Water Treatment Plant

Quotes Needed for Water Treatment Technology Services by CDCR

The California Department of Corrections and Rehabilitation (CDCR) is looking for maintenance, calibration, inspection, and repair services for the Supervisory Control and Data Acquisition (SCADA) system at the California State Prison, Solano water treatment plant. This agreement has a performance period from July 1, 2024, to June 30, 2027. As per the RFQ documents, the initial agreement will not exceed $180,000.

Interested vendors are required to participate in a mandatory walk-through of the facility before submitting their quote package. Walk-throughs must be scheduled through Martha Gallegos and Billy Ray Butler by April 5. The deadline to submit a bid package is 2 p.m. on May 7. Ashley Koewler is the point of contact for this RFQ.

If it is deemed in the best interest of the CDCR, there may be an opportunity to amend the resulting agreement to extend its term and/or increase funding according to the original Scope of Services. To be considered for this opportunity, interested vendors must complete the walk-through and submit their bid packages on time.

The California Department of Corrections and Rehabilitation (CDCR) seeks maintenance, calibration, inspection, and repair services for its Supervisory Control and Data Acquisition (SCADA) system at California State Prison Solano’s water treatment plant. The performance period for this contract runs from July 1st, 2024 to June 30th, 2027 with an initial agreement not exceeding $180k as stated in RFQ documents.

To apply for this opportunity, interested vendors must participate in a mandatory site visit before submitting their quote package by April 5th through Martha Gallegos or Billy Ray Butler. The deadline to submit a bid package is May 7th at 2 pm., with Ashley Koewler serving as the point of contact.

If deemed advantageous by CDCR officials, there may be an opportunity to amend the resulting agreement to extend its term or increase funding based on the original Scope of Services. In order to be considered for this project, vendors must complete their site visits on time and submit their bids accordingly.

California Department of Corrections & Rehabilitation (CDCR) requires maintenance calibration inspection repair services SCADA system at CA state prison solano water treatment plant . Performance period from July first two thousand twenty four till June thirty first two thousand twenty seven initially not exceeding one hundred eighty thousand dollars as stated RFQ documents . Interested vendors need mandatory site visit before submitting quote package which should be scheduled through Martha Gallegos or Billy ray butler by April fifth . Bid submission deadline May seventh two pm . Ashley koewler point contact